Profiling

A lesser known but important aspect of Stabilised Pavements business is its profiling activities. The company was responsible for one of the largest single profiling jobs in Australia - The M4 Motorway West upgrade in New South Wales.

Profiling - Click to enlarge (40KB)The upgrade involved a 20km stretch between the service  centres at Prospect and Mulgoa Rd, Penrith. The upgrade was undertaken over a 15 month period ending in April 1998 during which the two existing lanes in each direction were upgraded to three lanes, and the road surface was re-sheeted to achieve an additional pavement life of 20 years.

Stabilised Pavements has found that profilers are becoming widely used in excavation. While the initial cost may be slightly higher than a hydraulic excavator, the method is much quicker and neater, and the finely milled materials can be reused. Disruption to business and traffic is minimised.

Profiler - Click to enlarge (39KB)Stabilised Pavements has a fleet of profilers to suit a wide variety of conditions. They range from 1m to 2.6 m wide and incorporate the latest technology. The company's 2.6m Wirtgen machine is the only machine in Australia to cut at this width to 450mm in one pass.

To view equipment click here.

Read more on the M4 and other Profiling jobs.

For more information Contact Us.

Back to Top

 

© Stabilised Pavements Group 2003-2007 | Contact Us